CATEGORY
Address: No. 6-5, Phase IV, Liandong U-Grove, Shenbei New District, Shenyang City, Liaoning Province
Mobile phone:13998121527(Manager Li)
Landline:024-86670968,024-86626713
Email:LiLu@kcvac.cn
Website:www.kcvac.cn
Product Center
High-Vacuum Dual-Chamber Multifunctional Coating Equipment
Category:
Electron Beam and Ion Beam Coating Equipment
Contact Us
Product Description
Vacuum: Ultimate vacuum of 6×10⁻⁵ Pa
Working vacuum: 6 × 10⁻⁴ Pa
Vacuum recovery time for work: ≤10 minutes when connecting to the glove box
Do not connect the glove box; purge with dry nitrogen for ≤30 minutes.
One set of electron-beam coating equipment with four crucibles
Metal evaporation sources and organic evaporation sources can be configured according to customer requirements.
Coating thickness probes and coating thickness gauges are available in both domestic and imported options.
The metal evaporation source is equipped with a 1000 W power supply.
The organic evaporation source is equipped with a temperature-controlled power supply, with a temperature control accuracy of ±1°C.
Previous Page
Previous Page
Next page
Related Products